View of Stoney gates, looking east. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, HAER WASH,27-DIER,1-7.tif - Fæ
View of Stoney gates and headgate house, looking west towards lined canal. To the left on the hill is the relief operator's cottage. Photo by Jet Lowe, HAER, 1989. - Puget Sound HAER WASH,27-DIER,1-6.tif - Fæ
View of Stoney gates and headgate house, looking north. Steel for frame supporting Stoney gates produced by Jones and Laughlin, Pittsburg, Pennsylvania. Photo by Jet Lowe, HAER, HAER WASH,27-DIER,1-8.tif - Fæ
View of gate to fish ladder, walkway to headgate operator's cottage, and operator's cottage, looking east. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, HAER WASH,27-DIER,1-5.tif - Fæ
Detail of Stoney gates, showing shaft that drives rack and pinion gears to raise and lower gates, looking south. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light HAER WASH,27-DIER,1-9.tif - Fæ
Detail of gear of Stoney gate, looking northwest. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue HAER WASH,27-DIER,1-10.tif - Fæ
East and north facades of headgate house; to the right is the utility building. View looking southwest. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, HAER WASH,27-DIER,1-11.tif - Fæ
Detail of clutch and backup gasoline engine for powering Stoney gates. Clutch mechanism manufactured by Baldridge Machine Company, Detroit, Michigan, ca. 1910. Instrument to the HAER WASH,27-DIER,1-12.tif - Fæ
View of tramway and car used for servicing dam, looking north. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North HAER WASH,27-DIER,1-22.tif - Fæ
View, looking west, of fish ladder and steel frame supporting fish trap, both constructed by U.S. Army Corps of Engineers, 1949. One-story wood-frame building with hip roof is a HAER WASH,27-DIER,1-16.tif - Fæ
View, looking east, of tower supporting tramway; to the right on the hill is the motor house for operating the tramway. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and HAER WASH,27-DIER,1-24.tif - Fæ
West facade of utility building, looking east. Photo by Brian C. Morris, Puget Power, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North HAER WASH,27-DIER,1-14.tif - Fæ
View of storage shed and motor house for tramway, looking southwest. Photo by Brian C. Morris, Puget Power, 1989. - Puget Sound Power and Light Company, White River HAER WASH,27-DIER,1-25.tif - Fæ
Detail of tramway car. Photo by Brian C. Morris, Puget Power, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, HAER WASH,27-DIER,1-23.tif - Fæ
View, looking north, of motor house; the electric motor and electric-powered winch are housed in section of building to the left. Photo by Jet Lowe, HAER, 1989. - Puget Sound HAER WASH,27-DIER,1-27.tif - Fæ
Utility building (east and north facades) looking southeast. Photo by Brian C. Morris, Puget Power, 1989. - Puget Sound Power and Light Company, White River Hydroelectric HAER WASH,27-DIER,1-13.tif - Fæ
View, looking east, of motor house; the electric motor and electric-powered winch are housed in section of building to the left. The U-bolt and concrete deadman which anchors HAER WASH,27-DIER,1-26.tif - Fæ
View, looking northeast (towards headworks), of electric-powered winch, manufactured ca. 1910 by Lidgerwood Mfg. Company of New York. At far end of winch is a ca. 1950s HAER WASH,27-DIER,1-28.tif - Fæ
General view of fish trap, looking east. Photo by Brian C. Morris, Puget Power, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River HAER WASH,27-DIER,1-15.tif - Fæ
View, looking south, of low crib dam and headworks from north side of White River. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power and Light Company, White River HAER WASH,27-DIER,1-18.tif - Fæ
General view of dam and headworks, looking northeast. Photo by Brian C. Morris, Puget Power, 1989. - Puget Sound Power and Light Company, White River Hydroelectric Project, 600 HAER WASH,27-DIER,1-17.tif - Fæ
Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA HAER WASH,27-DIER,1- (sheet 6 of 25).tif - Fæ
Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA HAER WASH,27-DIER,1- (sheet 4 of 25).tif - Fæ
Puget Sound Power and Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA HAER WASH,27-DIER,1- (sheet 5 of 25).tif - Fæ
First generator installed at the White River Power Plant, Washington (5017555271).jpg - Fæ
Draft environmental impact statement of the White River Dam Project (IA draftenvironment48286unit).pdf - Fæ
Final environmental impact statement of the White River Dam Project (IA finalenvironment04unit).pdf - Fæ
White Pine power project - 1500 megawatt coal-fueled generating facility, White Pine County, Nevada - final environmental impact statement (IA whitepinepowerprunit 2).pdf - Fæ
Workers making repairs on the diversion dam at Buckley, October 6, 1910 (SPWS 110).jpg - BMacZeroBot
Concrete culvert for flume being built under railroad trestle at Buckley, June 10, 1911 (SPWS 116).jpg - BMacZeroBot
Concrete mixer at diversion dam headworks, September 15, 1910 (SPWS 151).jpg - BMacZeroBot
Construction camp no 1 near Buckley, February 16, 1911 (SPWS 400).jpg - BMacZeroBot
Construction of concrete culvert underneath Northern Pacific Railway at Buckley, WA, May 25, 1911 (SPWS 522).jpg - BMacZeroBot
Intake at the diversion dam near Buckley, July 11, 1911 (SPWS 669).jpg - BMacZeroBot
Flume construction under the Northern Pacific Railway tracks at Buckley, March 22, 1911 (SPWS 684).jpg - BMacZeroBot
Gate construction at intake near diversion dam, August 31, 1911 (SPWS 689).jpg - BMacZeroBot
Diversion dam with intake gates open, April 12, 1912 (SPWS 7).jpg - BMacZeroBot
Intake gates at the diversion dam headworks and gatekeeper's house, April 12, 1912 (SPWS 8).jpg - BMacZeroBot
Looking west along the tailrace from the powerhouse site toward the Stuck River showing main construction camp on right (SPWS 84).jpg - BMacZeroBot
Gatekeeper's cottage at the diversion dam, April 12, 1912 (SPWS 9).jpg - BMacZeroBot
Machinery in basement of White River powerhouse, April 12, 1912 (SPWS 99).jpg - BMacZeroBot