×
Vue du batiment principal.jpg - Stalibiza
Second adaptive thin shell mirror delivered to ESO.jpg - Jmencisom
Artists’s Rendering of the primary mirror of the ELT.jpg - Huntster
First Shell of ELT Deformable Mirror Completed (40093461835).jpg - Jo-Jo Eumerus
LSST Telescope - L1 Lens of the camera.jpg - Pline
Rubin Observatory Camera Lens (ann21036b).tiff - OptimusPrimeBot
Rubin Observatory Camera Lens (ann21036b).jpg - OptimusPrimeBot
L1 Lens (rubin-l1-lens).tiff - OptimusPrimeBot
ELT M1 segment blanks queuing in the Safran Reosc polishing facilities (img-7856).tiff - OptimusPrimeBot
ELT M1 segment blanks queuing in the Safran Reosc polishing facilities (img-7856).jpg - OptimusPrimeBot
ELT M1 segment assembly in final inspection (img-9115).tiff - OptimusPrimeBot
ELT M1 segment assembly in final inspection (img-9115).jpg - OptimusPrimeBot
Grinding the ELT’s M3 mirror (20230831 162758).tiff - OptimusPrimeBot
Grinding the ELT’s M3 mirror (20230831 162758).jpg - OptimusPrimeBot
ELT M1 segments take shape at Safran Reosc polishing facilities (img-6499).tiff - OptimusPrimeBot
ELT M1 segments take shape at Safran Reosc polishing facilities (img-6499).jpg - OptimusPrimeBot
The ELT M2 mirror in metrology (img-7432).tiff - OptimusPrimeBot
The ELT M2 mirror in metrology (img-7432).jpg - OptimusPrimeBot
Polishing of VLT mirrors- ESO and R E O S C sign contract (eso8907a).tiff - OptimusPrimeBot
Polishing of VLT mirrors- ESO and R E O S C sign contract (eso8907a).jpg - OptimusPrimeBot
❮
❯