×
DIVERSIONARY CANAL OF THE TRUCKEE RIVER AT FERNLEY IS PART OF THE NEWLANDS IRRIGATION PROJECT - NARA - 553080.jpg - US National Archives bot
DIVERSIONARY CANAL OF THE TRUCKEE RIVER AT FERNLEY IS PART OF THE NEWLANDS IRRIGATION PROJECT - NARA - 553081.jpg - US National Archives bot
SIGNS ON ROUTE 95 NEAR FERNLEY. THE ONE ON THE LEFT DESCRIBES THE NEWLANDS IRRIGATION PROJECT - NARA - 553669.jpg - US National Archives bot
View of EPA Farm metal weather tower, facing east, showing thirty-acre irrigated field - Nevada Test Site, Environmental Protection Agency Farm, Weather Tower, Area 15, Yucca HABS NEV,12-MERC.V,3F-1.tif - Fæ
Agricultural Nevada (1911) (17946003971).jpg - SteinsplitterBot
Agricultural Nevada (1911) (17945330605).jpg - SteinsplitterBot
Agricultural Nevada (1911) (17757671040).jpg - SteinsplitterBot
Water Supply and Irrigation Papers of the United States Geological Survey (1910) (14579297470).jpg - SteinsplitterBot
Carson River East of Carson City, Nevada (18012816328).jpg - INeverCry
Circular Irrigation, Central Nevada - Flickr - brewbooks.jpg - Josve05a
Irrigation-on-experimental-farm-operated-by-epas-las-vegas-national-research-center-may-1972 6990322862 o.jpg - Artix Kreiger
RECLAMATION, BUREAU OF. TRUCKEE-CARSON PROJECT, NEVADA; CANAL CARRYING TRUCKEE RIVER TO RESERVOIR LCCN2016865098.jpg - Fæ
Water quality of the Newlands Reclamation Project (IA waterqualityofne97roll).pdf - Fæ
Nevada. Location of irrigated Land. 1949 - btv1b532004277.jpg - Gzen92Bot
❮
❯