×
USS Harry S. Truman operations 150219-N-MU551-041.jpg - Fæ
Ohio National Guard (24709524237).jpg - Junior Jumper
Ohio National Guard (39547715992).jpg - Junior Jumper
Shaft of the 48th Street ADA Elevator that will provide access to the future LIRR Concourse. (CH014B, 9-21-2017) (37230383241).jpg - Epicgenius
Steel framing for the 48th Street ADA elevator that will provide street level access to the future LIRR Concourse. (CM014B, 2-05-2018) (40173012311).jpg - Epicgenius
Upper Level Terminal East Side Access July 2018 (2) (43394696045).jpg - Tyler ser Noche
Elevator installation in the west cavern of the LIRR passenger terminal. (CM007, 11-14-2018) (45188133214).jpg - Epicgenius
Elevator framing installed in the east cavern of the passenger terminal. (CM007, 12-06-2018) (45494827254).jpg - Epicgenius
Installing steel supports for a passenger elevator in the east cavern. (CM007, 01-09-2019) (45976904584).jpg - Epicgenius
Welding the base of an elevator frame in the future LIRR Terminal. 07-05-2019 (48266211016).jpg - Epicgenius
Installing vertical beams on an elevator frame that will carry passengers between the mezzanine and the upper and lower level platforms in the future LIRR Terminal. 07-03-2019 (48266288832).jpg - Epicgenius
Continued installation of elevator framework in the future LIRR Terminal. 07-30-2019 (48441517012).jpg - Epicgenius
Continued installation of elevator framework in the future LIRR Terminal. 07-30-2019 (48497492562).jpg - Epicgenius
Installing elevator paneling in the future LIRR Terminal. 09-06-2019 (48728189657).jpg - Epicgenius
Elevator frame installation in the future LIRR Terminal. 10-16-2019 (48959362196).jpg - Epicgenius
❮
❯