×
2009 Puget Sound Energy logo.png - Hedwig in Washington
Puget Sound Power & Light Co. annual report, 1950 (34658074176).jpg - Jmabel
Lake Kapowsin as seen from top of penstock site, March 11, 1903 (SPWS 0).jpg - BMacZeroBot
Second trestle being built on cable incline, April 21, 1903 (SPWS 109).jpg - BMacZeroBot
Men on lifelines doing rockwork on the flume line site, June 6, 1903 (SPWS 136).jpg - BMacZeroBot
Looking north across reservoir towards reservoir site, March 11, 1903 (SPWS 14).jpg - BMacZeroBot
Worker in drafting room at the reservoir camp, April 25, 1903 (SPWS 145).jpg - BMacZeroBot
Sawmill and flume substructure, November 15, 1903 (SPWS 148).jpg - BMacZeroBot
Men clearing right of way for flume line, April 23, 1903 (SPWS 15).jpg - BMacZeroBot
Tacoma Railway & Power Company's power station and car barn, October 21, 1904 (SPWS 167).jpg - BMacZeroBot
Pack train being loaded for trip to headworks site, June 5, 1903 (SPWS 17).jpg - BMacZeroBot
Reservoir site showing wood stave pipe and forebay construction, November 17, 1903 (SPWS 20).jpg - BMacZeroBot
Powerhouse showing completed addition on the right, February 26, 1925 (SPWS 21).jpg - BMacZeroBot
Flume construction showing Mount Rainier in background, December 30, 1903 (SPWS 220).jpg - BMacZeroBot
Flume construction showing trestle at canyon near Puyallup River, December 31, 1903 (SPWS 233).jpg - BMacZeroBot
Flume line site, April 23, 1903 (SPWS 27).jpg - BMacZeroBot
Engineer corps working at flume line site, April 23, 1903 (SPWS 283).jpg - BMacZeroBot
Warehouse, machine shop and hoisting plant at the reservoir site, August 4, 1903 (SPWS 357).jpg - BMacZeroBot
Mount Rainier viewed from near camp no 1, June 6, 1903 (SPWS 382).jpg - BMacZeroBot
Construction camp no 3, March 16, 1903 (SPWS 504).jpg - BMacZeroBot
Transmission line poles east of Sumner, August 10, 1903 (SPWS 51).jpg - BMacZeroBot
Men working on pile drivers, May 30, 1903 (SPWS 511).jpg - BMacZeroBot
Spillway no 1 at the flume, December 31, 1903 (SPWS 517).jpg - BMacZeroBot
Workers laying stringers on trestle, August 4, 1903 (SPWS 529).jpg - BMacZeroBot
Transmission lines crossing Northern Pacific Railway tracks, June 9, 1904 (SPWS 603).jpg - BMacZeroBot
Mount Rainier as viewed from the flume line, June 26, 1904 (SPWS 615).jpg - BMacZeroBot
Double transmission line near Sumner with Mount Rainier in the distance, June 13, 1904 (SPWS 628).jpg - BMacZeroBot
Transmission line poles through Holmoldt's hop ranch, August 10, 1903 (SPWS 63).jpg - BMacZeroBot
Double transmission lines making a right angle turn at Orting, June 13, 1904 (SPWS 631).jpg - BMacZeroBot
Junction of Seattle and Tacoma transmission lines, showing disconnecting switches, June 13, 1904 (SPWS 632).jpg - BMacZeroBot
Construction camp no 4, June 6, 1903 (SPWS 633).jpg - BMacZeroBot
Construction camp at lower reservoir, March 17, 1903 (SPWS 640).jpg - BMacZeroBot
Tacoma substation interior showing transformers, October 21, 1904 (SPWS 641).jpg - BMacZeroBot
Mowich Glacier exploration party heading home from Crater Lake, August 26, 1904 (SPWS 643).jpg - BMacZeroBot
Transmission lines in Stuck Valley near Sumner, August 10, 1903 (SPWS 649).jpg - BMacZeroBot
Nearly completed south addition to powerhouse, August 26, 24 (SPWS 65).jpg - BMacZeroBot
Workers camp at the reservoir site, March 18, 1903 (SPWS 652).jpg - BMacZeroBot
Powerhouse with view of Puyallup river, June 26, 1904 (SPWS 656).jpg - BMacZeroBot
Construction camp no 5, April 22, 1903 (SPWS 685).jpg - BMacZeroBot
Flume line trestle construction, June 9, 1903 (SPWS 75).jpg - BMacZeroBot
Construction on the addition to the south end of the powerhouse, April 24, 1924 (SPWS 77).jpg - BMacZeroBot
Rear view of powerhouse showing newly constructed air tanks for the fourth generating unit, February 26, 1925 (SPWS 80).jpg - BMacZeroBot
Looking west along the tailrace from the powerhouse site toward the Stuck River showing main construction camp on right (SPWS 84).jpg - BMacZeroBot
Wood stave pipe and forebay construction, Electron Reservoir, November 17, 1903 (SPWS 94).jpg - BMacZeroBot
Pack train being loaded for trip to headworks site, June 5, 1903 (SPWS 95).jpg - BMacZeroBot
Two men taking a reading at a gauging station, June 4, 1903 (SPWS 97).jpg - BMacZeroBot
Site of cable incline, viewed from end of cut, April 21, 1903 (SPWS 111).jpg - BMacZeroBot
Workers at spur railway site, April 25, 1903 (SPWS 246).jpg - BMacZeroBot
Construction camp no 3, ca 1903 (SPWS 2).jpg - BMacZeroBot
Transmission lines crossing the river at Orting, June 13, 1904 (SPWS 630).jpg - BMacZeroBot
Construction camp no 8, May 30, 1903 (SPWS 673).jpg - BMacZeroBot
Puget Sound Energy buildings(cropped), Aerial Bellevue Washington November 2011.jpg - Xnatedawgx
The Town Crier, v.15, no.50, Dec. 11, 1920 - DPLA - 37f26783bbd274eca9a46efa6e846211 (page 3).jpg - DPLA bot
PSE substation near Bremerton, WA.jpg - Buidhe
PSE substation near Bremerton, WA 2.jpg - Buidhe
Seattle - gas meters for floating homes on Westlake 02.jpg - Jmabel
Seattle - gas meters for floating homes on Westlake 01.jpg - Jmabel
Seattle - gas meters for floating homes on Westlake 03.jpg - Jmabel
❮
❯